How going solar works with us

Six steps, in this order. We run each one and tell you where your project stands, so you are never guessing what happens next.

  1. Step 1

    Quote and design

    Send us your address and a recent electric bill. We design a system around how much power your home uses and when it uses it.

  2. Step 2

    Agreement

    You review the design, the equipment and the terms in writing. Nothing is ordered or scheduled until you sign.

  3. Step 3

    Site survey

    A technician checks your roof, attic and electrical panel so the plans match your house.

  4. Step 4

    Permits and utility approval

    We file the building permit with your city or county and the interconnection application with your utility.

  5. Step 5

    Installation

    Our own crew installs the panels, the battery and the electrical work, then the city inspects it.

  6. Step 6

    Permission to operate

    Your utility gives final approval and the system is switched on. We show you how to follow it in the monitoring app.

What installation day looks like

  1. Mounting rails and wiring laid out across a gray shingle roof
    Mounting rails and wiring go on first.
  2. Black solar panels covering two faces of a gray shingle roof, seen from the ridge under a blue sky
    The panels follow, row by row.
  3. An angle gauge resting on a newly installed solar panel
    The finished array is measured and checked.

How long it takes

Most of the calendar time is waiting on two offices we don't control: your city or county permit office, and your utility. Both vary a lot from place to place. Before you sign, we give you an estimate for your address, and we update you when either one moves.